The HDD mud system include a double deck Mud Cleaner, jet mud mixer, centrifugal pump, and a Solid Control System Mud Tank.
The drilling-fluid system--generally called the"subway system"--is the single component of the well-construction procedure which remains in touch with the wellbore throughout the entire drilling operation.
Installation and Commissioning
1.Join the inlet opening of drilling fluid mixing jet mixer using the outlet pipe of sand pump, and the jopper socket contributes to drilling mud tank.
2. 6″flanges should be utilized at inlet and outlet.
3. Base plate of the hopper should be fixed tightly.
4. The hopper shouldn't be equipped too high, since the higher, the less of blending capacity.
5. The sand pump used here should fit with the mixing jet mixer.
Drilling-fluid systems are formulated and designed to perform effectively under anticipated wellbore conditions. Advances in drilling-fluid technology have made it feasible to employ a cheap, fit-for-purpose method for each period from the well-construction procedure.
DC Strong control can customize its method to generate the arctic solids control system that's solely implemented under chilly temperature to meet the requirements of the polar cold ( minus 40 degrees centigrade ) functioning conditions. If you've got interesting with it, please feel free to contact us.