Oil and gas drilling fluid solid control system:
The function of oil and gas drilling fluid solid control system is control and separate of the drilling fluid, to make drilling fluid can be reused, which is also called drilling mud cleaning system. The solid control system is apply to 2000-7000m oil and gas drilling.
Solid control system is consist of 3 to 7 modular composite tank body. The tank bottom use new cone bottom structure. Between tank and tank, cabin and cabin also can be separated and can be directed to meet the drill working requirements. The whole solid control system has 5 stage cleaning equipment, include shale shaker, desander, desilter, decanter centrifuge vacuum degasser, mud agitators and ect.
Quality Control System:SY/T6276、ISO/CD14690< Oil and gas industry health safety environmental protection and environmental management system> process flow, the equipments conform to API13C and the related standard and norm.
Main parameter:
Drill rig model | ZJ20 | ZJ30 | ZJ40 | ZJ50 | ZJ70 |
Drilling fluid tank volume (m3/h) | ≥160 | ≥160 | ≥180 | ≥200 | ≥270 |
Reserve tank volume e(m3/h) | - | ≥80 | ≥80 | ≥120 | ≥160 |
Shale shaker (m3/h) | ≥140 | ≥140 | ≥240 | ≥280 | ≥360 |
Degasser (m3/h) | √ | √ | 240 | 300 | 360 |
Desander (m3/h) | ≥120 | ≥180 | ≥200 | ≥240 | ≥320 |
Desilter(m3/h) | ≥120 | ≥180 | ≥200 | ≥240 | ≥320 |
Middle speed centrifuge (m3/h) | √ | √ | 40 | 50 | 50 |
High speed centrifuge (m3/h) | - | - | √ | 35 | 40 |
Mixing aggravate (m3/h) | ≥120 | ≥180 | ≥200 | ≥240 | ≥300 |
Shear pump(m3/h) | ≥100 | ≥120 | ≥120 | ≥120 | ≥120 |
perfusion pump(m3/h) | ≥100 | ≥150 | ≥180 | ≥200 | ≥240 |